Agenda item

25/00896/FP - STEVENAGE BOROUGH COUNCIL DEPOT CAVENDISH ROAD

To consider the erection of covered storage building for household waste.

Minutes:

The Committee considered an application for the erection of a covered storage building for household waste at the Stevenage Borough Council Waste Depot.

 

It was noted that household waste was currently stored within an external compound with concrete retaining walls, located toward the rear of the site backing onto Meadway. The proposed development comprised a steel-framed structure with a metal roof, designed to be in keeping with existing buildings on the site.

 

The Committee was advised that the purpose of the structure was to provide an enclosed environment for the storage of household waste to address pest control and meet environmental requirements. Elevation plans demonstrated that the proposed building would be similar in appearance and scale to the existing shed on site, with the new covered structure positioned adjacent to it within the identified storage area.

 

Members asked about how the waste was currently stored and what happened to it after it is processed at the depot. The officer explained that operationally it was stored within concrete containing walls, and that the proposed new structure would help address the new rules around storing food waste. It was noted that the member should contact the Waste Management Team for further information.

 

A recorded vote* was taken on the application and it was RESOLVED that planning permission be GRANTED subject to the following conditions:

 

1. The development hereby permitted shall be carried out in accordance with the following approved plans:SKK4307/001 Rev B; SKK4307/101 Rev B; SKK4307/102 Rev B; SKK4307/104 Rev B; SKK4307/106 Rev B; SKK4307/002 Rev A;

 

2. The development hereby permitted shall be begun before the expiration of three years from the date of this permission

 

3. No construction work relating to this permission shall be carried out on any Sunday, Public or Bank Holiday nor at any other time except between the hours of 0730 and 1800 on Mondays to Fridays and between the hours of 0900 and 1300 on Saturdays.

 

4. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the local planning authority. An investigation and risk assessment must be undertaken and where remediation is necessary a remediation scheme must be submitted to and approved in writing by the local planning authority. Following completion of measures identified in the approved remediation scheme a verification report must be submitted to

and approved in writing by the local planning authority.

 

The Council has acted Pro-Actively for the following reason:-

 

Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the National Planning Policy Framework and in accordance with the Town and Country Planning (Development Management Procedure) (England) Order 2015.

 

INFORMATIVE

 

1. Public Information on Planning Applications

Warning: all information provided on your planning application is now publicly available. Individuals and organisations offering their services may contact you. The Council does not endorse or approve any builders, surveyors, trades persons or other supplier, and advises householders to obtain quotes/references, and check the legitimacy of any contractor who contacts them before making payment.

 

2. Community Infrastructure Levy

Stevenage Borough Council adopted a Community Infrastructure Levy (CIL) Charging Schedule at Full Council on 27 January 2020 and started implementing CIL on 01 April 2020.

 

This application may be liable for CIL payments and you are advised to contact the CIL Team for clarification with regard to this. If your development is CIL liable, even if you are granted an exemption from the levy, please be advised that it is a requirement under Regulation 67 of The Community Infrastructure Levy Regulations 2010 (as amended) that CIL

Form 6 (Commencement Notice) must be completed, returned and acknowledged by Stevenage Borough Council before building works start. Failure to do so will mean you risk losing the right to payment by instalments and a surcharge will be imposed. NB, please note that a Commencement Notice is not required for residential extensions if relief has been granted.

 

Stevenage's adopted CIL Charging Schedule and further details of CIL can be found on the Council's webpages at www.stevenage.gov.uk/CIL or by contacting the Council's CIL Team at CIL@Stevenage.gov.uk.

 

3. Building Regulations

To obtain advice regarding current Building Regulations please contact Hertfordshire Building Control Ltd. by emailing us at building.control@hertfordshirebc.co.uk or phoning us on 01438 879990.

 

To make a building regulations application please apply through our website portal at https://www.hertfordshirebc.co.uk/contact-us/ payment can be made online or by phoning the above number after the application has been uploaded. Please phone Hertfordshire Building Control for fees guidance on 01438 879990.

 

Hertfordshire Building Control can also be contacted by post at Hertfordshire Building Control Ltd, Campus East, Welwyn Garden City, Hertfordshire, AL8 6AE.

Once a building regulations application has been deposited with relevant drawings and fee building work may commence. You will be advised in their acknowledgement letter of the work stages we need to inspect but in most instances these are usually:

 

  • Excavation for foundations
  • Damp proof course
  • Concrete oversite
  • Insulation
  • Drains (when laid or tested)
  • Floor and Roof construction
  • Work relating to fire safety
  • Work affecting access and facilities for disabled people
  • Completion

 

Please phone Hertfordshire Building Control on 01438 879990 before 10.00am to ensure a same day inspection (Mon - Fri).

 

4. Party Wall etc. Act 1996

Any work that affects a party wall, including foundations dug within 3.0m of a neighbouring building, may be controllable under the Act and may require approval from the adjoining owner(s). Party Wall Act matters are always civil matters and it is neither Stevenage Borough Council's nor Hertfordshire Building Control Ltd's remit to control or enforce Party Wall act matters. Please refer to the Government's explanatory booklet The Party Wall etc. Act 1996, a copy of which is available online at

https://www.gov.uk/government/publications/the-party-wall-etc-act-1996-revisedexplanatory-booklet

 

5. Biodiversity Net Gain

Applications where Biodiversity Net Gain is not required as development is considered De Minimis

The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition "(the biodiversity gain condition") that development may not begin unless:

a) a Biodiversity Gain Plan has been submitted to the planning authority, and

b) the planning authority has approved the plan.

 

The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan if one is required in respect of this permission would be Stevenage Borough Council.

 

There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not apply.

Based on the information available this permission is considered to be one which will not require the approval of a biodiversity gain plan before development is begun because the following statutory exemption or transitional arrangement is considered to apply.

 

1. Development below the de minimis threshold, meaning development which:

a) does not impact an onsite priority habitat (a habitat specified in a list published under section 41 of the Natural Environment and Rural Communities Act 2006); and

b) impacts less than 25 square metres of onsite habitat that has biodiversity value greater than zero and less than 5 metres in length of onsite linear habitat (as defined in the statutory metric).

 

Where the local planning authority considers that the permission falls within paragraph 19 of Schedule 7A to the Town and Country Planning Act 1990, the permission which has been granted has the effect of requiring or permitting the development to proceed in phases. The modifications in respect of the biodiversity gain condition which are set out in Part 2 of the Biodiversity Gain (Town and Country Planning) (Modifications and Amendments) (England) Regulations 2024 apply.

 

Biodiversity gain plans are required to be submitted to, and approved by, the planning authority before development may be begun, and, if subject to phased development, before each phase of development may be begun.

 

If the onsite habitat includes irreplaceable habitat (within the meaning of the Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) there are additional requirements for the content and approval of Biodiversity Gain Plans. The Biodiversity Gain Plan must include, in addition to information about steps taken or to be taken to minimise any adverse effect of the

development on the habitat, information on arrangements for compensation for any impact the development has on the biodiversity of the irreplaceable habitat. The planning authority can only approve a Biodiversity Gain Plan if satisfied that the adverse effect of the development on

the biodiversity of the irreplaceable habitat is minimised and appropriate arrangements have been made for the purpose of compensating for any impact which do not include the use of biodiversity credits.

 

More information can be found in the Planning Practice Guidance online at

https://www.gov.uk/guidance/biodiversity-net-gain

 

6. Hertfordshire County Council as Highways Authority

Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the

applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website:

http://www.hertfordshire.gov.uk/services/transtreets/highways/ or by telephoning 0300 1234047.

 

7. Hertfordshire County Council as Highways Authority

Debris and deposits on the highway: It is an offence under section 148 of the Highways Act 1980 to deposit compost, dung or other material for dressing land, or any rubbish on a made up carriageway, or any or other debris on a highway to the interruption of any highway user. Section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all

times to ensure that all vehicles leaving the site during construction of the development and use thereafter are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available by telephoning 0300 1234047.

 

*Recorded Vote

 

 For – Councillors Julie Ashley-Wren, Stephen Booth, Robert Boyle, Peter Clark, Coleen De Freitas, Lynda Guy, Rob Henry, Claire Parris, Ellie Plater and Carolina Veres

Against – 0

Abstentions – 0

Absent – Councillors Kamal Choudhury, Forhad Chowdhury, Akin Elekolusi and Nigel Williams

 